Maintenance
	
											31 October 2020 / 09:30 - 31 October 2020 / 17:00										
										
									
								
								| Description | In the Kruyt building, the 5th and 8th floor access-layer switches have to be replaced because the hardware is outdated and the power supply of the switches no longer works optimally. | 
| 
 | |
| impact | During the works, half of the east and south wing will have no network connectivity. Functionally, nothing changes for the (end) users | 
