Maintenance
28 December 2020 / 09:00 - 28 December 2020 / 17:00
Description | The HP switches within the various UU buildings will be equipped with the latest firmware |
impact | 5 minutes of downtime per switch and therefore a maximum of 5 minutes of network interruption for that specific building. Planning is communicated separately. Update time will be coordinated for the target groups DGK and FSC Security |